Sign In | Join Free | My gimpguru.org
China FORWA PRECISE PLASTIC MOULD CO.,LTD. logo
FORWA PRECISE PLASTIC MOULD CO.,LTD.
Chinese supplier of precision plastic molds with 20 years of experience Chinese supplier of plastic products with 20 years of experience
Active Member

10 Years

Home > Custom Plastic Parts >

Part For Light Device , Transparent Light , Transparent Light Is The Main Part For Transfer Light

FORWA PRECISE PLASTIC MOULD CO.,LTD.
Contact Now

Part For Light Device , Transparent Light , Transparent Light Is The Main Part For Transfer Light

Brand Name : Forwa

Model Number : Custom

Certification : ISO9001 / ISO14001 / IATF16949

Place of Origin : China

MOQ : 1 set

Price : Negotiation

Payment Terms : T/T

Supply Ability : About 50 Sets per month

Delivery Time : 30 days after 2D and 3D mould design confirmed

Packaging Details : Custom wooden box

Part Name : Transparent light

Cavity : 1*4

Material : PMMA

color : Transparency

Runner : Cold runner

Gate : Fan gate

Cavity steel : S136

Core Steel : S136

Insert Steel : S136

Generial polishing : Mirror Polishing

Tolerance : +/-0.03

Contact Now

Smart home robot

Mould information

1.Mould standard HASCO
2.Mould type 2 plate
3.Mould base steel 1.1730
4.A/B plate steel 1.2311
5.Core/Caviry steel S136
6.Runner type Cold runner
7.Gate type Fan gate
8.Project name Light device
9.Part name Transparent light
10.Material available PMMA or PC
11.Shrinkage rate 1.0055
12.Part color Transparency
13.Surface finishing Mirror polishing
14.Cycle time 40s
15.Injection machine 100T
16.Injection machine brand Arburg / Fanuc / Haitian
17.2D Mould structure CAD Software (DWG, DXF Format)
18.3D Mould structure UG, Proe Software (Prt, X-T, stp, step, Igs, Iges, Format etc.)
19.Mould folw report CAD Mould flow (PPT format)
20.Mould processing report Update each week
21.MOQ 1 set
22.Payment term T/T
23.Package Custom Wooden box
24.Deliverly date 30 days
25.Mould number According to customer requirement
26.Mould life 1 million shots

Part Function:

The part is for the light device. The main function of this part is very important that need to transfer the light to outside.

FAQ

Q: How can you get the quotation?

When we get the detailed information during working days, we will provide you the quotation within 24 hours.

Please help to provide us the following information with your inquiry.

1) 2D Part drawing. (CAD or DXF format)
2) 3D Part drawing. (Prt, X-T, stp, step, Igs, Iges, Format etc.)

3) Mould cavity. (1*1 or 2*2 or 4*4 etc.)
3) Part Material. (Material requirement or Material date sheet)

4) Mould standard. (DME or HASCO or LKM)

5) Mould standard component. (DME or HASCO or MISUMI or LKM)

6) Mould Steel.
7) Part surface treatment.
8) Quantity of plastic part. (per order / per month / annual)

9) Mould life.
10) Any special demands or requirements, such as packing, labels,delivery etc.

Part For Light Device , Transparent Light , Transparent Light Is The Main Part For Transfer Light

Q: What are the main oversea markets of Forwa?
1)Currently Forwa regular oversea customers are from the USA, the UK, Italy, Germany, France and India etc.

Q: How do we control the quality?

1). When getting the new order, Our team will open a meeting to analyze the part stucture and mould stucture carefully to ensure everyting is great.
2). Our team will review the mould design and improve it to ensure mould life and mould operation before start to build the mould.

3). The project team will follow each step mould processing to ensure the mould processing on time and the mould processing quality.

4). Our QC team will inspect all the mould components after each processing step finish and then go next step.

5). Our technical team will fit the mould carefully.

6). After the mould completed, our project team will check the mould operation before testing the mould.

7). Mould need to run about 3~4 hours during testing to ensure the mould operation.

8). The first sample inspected by QC and then provide the good samples to customer for testing.

9). During production, our IPQC will check the parts per 2 hours, ensure no any rejects;
10). FQC will check the products before sending to the warehouse;
11). 100% inspected by OQC before shipping out.

Part For Light Device , Transparent Light , Transparent Light Is The Main Part For Transfer Light

Q: What should we do if customer receive defective products?
1): If receive defective product, please send us the photos, we will feedback to our engineers and QC departments and solve the problems ASAP.

Q: How to pack the moulds and products?
1).For moulds, we will be coated one-layer anti-rust oil first,and then also will be covered thin films on the mould, finally pack into fumigation wooden case.
2).And as to products, we will pack into standard export cartons or as per customer’s request to pack.


Product Tags:

Plastic Injection Transparent Light Parts

      

Light Device Plastic Injection Parts

      
Quality Part For Light Device , Transparent Light , Transparent Light Is The Main Part For Transfer Light wholesale

Part For Light Device , Transparent Light , Transparent Light Is The Main Part For Transfer Light Images

Inquiry Cart 0
Send your message to this supplier
 
*From:
*To: FORWA PRECISE PLASTIC MOULD CO.,LTD.
*Subject:
*Message:
Characters Remaining: (0/3000)